  The Dazhou Beltway West Expressway project is one of the beltway loops around 18 prefecture-level cities in Sichuan Province, providing a fast connection between various development clusters in the Dazhou urban area. On September 26, 2022, important projects such as the Anyun Hub Interchange and the Xianpodeng Tunnel of the Dazhou Beltway Expressway officially commenced construction.


  The Xianpodeng Tunnel is located in Shixiahu Village, Shuanglong Town, Tongchuan District, and is one of the key projects of the west section of the beltway expressway. The tunnel has a maximum burial depth of 202.5 meters, with a length of 2864 meters for both the left and right lines. The net width of the tunnel is 10.75 meters, and the net height is 5 meters. The entrance of the tunnel is located in a landslide area, crossing two water diversion tunnels, and the surrounding rocks are classified as Grade IV and V. The tunnel type is a small net distance + separated long tunnel, with extremely complex geological conditions and poor surrounding rock properties.


LanHi


  The LanHi intelligent integrated drilling and arch trolley is a dual rock drilling and vertical arch integrated trolley that meets the needs of tunnel full-section construction and the benching method. The machine features a rigid integrated frame engineering chassis and dual rock drilling arms. The standing arch frame features a dual arm design, with three grippers and two hanging baskets. It provides four-wheel steering, four-wheel drive, and two-way driving, and supports electric construction and dieselpowered emergency response. It is easy to operate, has a low failure rate, high reliability, compact structure and convenient maintenance.


  At 9:00 a.m. on March 26, 2024, construction of the Xianpodeng Tunnel on the west section of the Dazhou Beltway Expressway officially commenced. Currently, the right line of the tunnel has smoothly entered the tunnel, and the excavation face construction has been fully initiated, while the left line has already excavated 256 meters.