What factors affect the spraying effect of a wet spraying robotic arm?
What factors affect the spraying effect of a wet spraying robotic arm? The spraying effect of wet spraying robotic arm is influenced by various factors, mainly including:
1. Equipment parameters:
The model, specifications, and technical parameters of the wet spraying robotic arm, such as spraying pressure, spraying flow rate, mixing efficiency, etc., directly determine the spraying effect.
The design and size of the nozzle, including the diameter and shape of the spray hole, affect the spray mode and atomization effect.
2. Operation control:
The technical level and experience of the operators, as well as their proficiency in the equipment, directly affect the wet spraying effect.
The adjustment of wet spraying parameters, such as water cement ratio, spraying speed, and angle, needs to be precisely controlled according to construction requirements.
3. Material properties:
The formula and ratio of concrete, including the types and proportions of cement, aggregates, admixtures, and additives, affect its fluidity and bonding properties.
The particle size distribution, shape, and surface characteristics of aggregates, as well as their impact on the spraying effect.
4. Environmental conditions:
The climatic conditions at the construction site, such as temperature, humidity, wind speed, etc., especially wind speed, have a significant impact on the wet spraying effect.
The spatial limitations of the construction environment, such as height, width, and layout of obstacles, may restrict the movement range and spraying direction of the wet spraying robot arm.
5. Safety measures:
The safety regulations and protective measures that must be followed during the wet spraying process, such as wearing appropriate protective equipment to ensure the safety of operators and the surrounding environment.
6. Maintenance and upkeep:
Regular maintenance and upkeep of the wet spraying robot arm, including cleaning, lubrication, and inspection, to ensure its normal operation and avoid a decrease in spraying effect caused by equipment failure.
7. Construction preparation:
Before construction, inspect the wet spraying robot arm to ensure that all components are intact and firmly connected, as well as prepare for the construction site, such as laying suitable substrates and setting up necessary support structures.
By comprehensively considering these factors and taking corresponding measures to optimize the wet spraying process, the spraying effect of the wet spraying robot can be significantly improved, ensuring construction quality.
What are the applicable scope of the three arm arch installation trolley? Application fields of three arm arch installation trolley
What are the applicable scope of the three arm arch installation trolley? As an efficient tunnel construction equipment, the three arm arch installation trolley is mainly applicable in the following areas:
1. Railway tunnel: In railway tunnel construction, the three arm arch installation trolley can quickly complete the arch installation work inside the tunnel, improve construction efficiency, and ensure the smooth laying of railway lines.
2. Highway tunnels: The construction of highway tunnels also requires a large amount of arch installation work. The three arm arch installation trolley can work stably under various geological conditions to ensure construction quality.
3. Water conservancy tunnels: In water conservancy construction, such as irrigation channels, hydropower tunnels, etc., the three arm arch installation trolley can help quickly complete the installation of the internal structure of the tunnel, promoting the smooth progress of water conservancy projects.
4. Urban rail transit: With the acceleration of urbanization, the construction of urban rail transit is increasing day by day. The three arm arch installation trolley can be effectively applied in the construction of urban rail transit tunnels such as subways and light rails.
5. National Defense Engineering: In some special national defense projects, such as military tunnels, underground facilities, etc., the three arm arch installation trolley can provide stable construction support under complex geological conditions.
6. Other underground projects: In addition to the above-mentioned application areas, the three arm arch installation trolley can also be applied to other underground projects that require tunnel construction, such as underground shopping malls, underground parking lots, etc.
The three arm arch installation trolley has been widely used in the field of tunnel construction due to its high efficiency and safety, making important contributions to the rapid development of modern tunnel construction. With the continuous advancement of technology and the expansion of application scenarios, its scope of application is expected to further expand.
What is overexcavation? How to handle the over excavation part?
Overexcavation refers to the part of the actual excavated section outside the reference line based on the designed excavation contour line. Here are several common explanations:
1. Overexcavation in mining: In mining operations, overbreak refers to the situation where the actual volume of rock excavated exceeds the designed or expected excavation boundary during the excavation process. This may be due to the inaccuracy of drilling and blasting techniques, or intentionally done to ensure the stability of the working face. Overexcavation can lead to resource waste and additional costs, as it means extracting more rocks than ores.
2. Overexcavation of tunnels and underground engineering: In tunnel construction and other underground engineering projects, oversize or overbreak refers to the actual excavation size of tunnels or caverns being greater than the design size. This may be due to limitations in construction technology, such as insufficient drilling accuracy and improper blasting control. Overexcavation may lead to structural instability, increase support costs, and may require additional repair work.
3. Overexcavation under complex geological conditions: In some complex geological conditions, in order to ensure construction safety and structural stability, the construction party may intentionally carry out a certain degree of overexcavation. This can provide more space for subsequent support and lining work to cope with unforeseeable geological changes.
4. Overexcavation in construction: In above ground construction, over excavation may refer to digging deeper than the design depth during the foundation excavation process. This situation is usually caused by measurement errors, construction errors, or measures taken to solve foundation problems.
How to handle the over excavation part?
In basic construction, if over excavation occurs, corresponding measures may need to be taken, such as sand piles, cement fly ash piles, dynamic compaction method, replacement method, preloading method, etc., to ensure the bearing capacity and stability of the foundation.
In construction projects such as site excavation or tunnel excavation, there may be three situations: over excavation, under excavation, and exact excavation height. Over excavation requires backfilling of the site, while under excavation requires continued excavation, both of which result in wastage of manpower, material resources, and financial resources. In order to better control costs and schedule, construction workers usually set up temporary leveling elevations based on the site conditions, and promptly inform excavator drivers or laborers of the required excavation thickness according to the elevations.
What is under excavation, the reasons for it, and the problems it brings about
Underexcavation is an engineering term that refers to the phenomenon where the perimeter of the cross-section of a shaft, tunnel, or other underground project is smaller than the design size after blasting. This term is mainly applied in fields such as coal mining, water conservancy and hydropower engineering, and highway tunnels.
In the construction of underground projects such as tunnels and tunnels, excavation is usually required according to the designed cross-sectional dimensions. However, due to various reasons, the actual excavated section may have some areas that do not meet the design requirements, which is called under excavation.
The reasons for under excavation may include: low drilling accuracy, resulting in the outer insertion angle, opening position, or drilling depth of the surrounding boreholes not meeting the requirements; Improper blasting techniques, such as unreasonable types and structures of explosives, unreasonable arrangement of surrounding holes, or unreasonable blasting design; Construction operations are not standardized, such as inaccurate contour lines, poor control of drilling positioning or drilling angle deviation, insufficient drilling or unauthorized reduction of drilling depth.
Underexcavation may bring some problems, such as affecting the quality and safety of the project, requiring additional treatment to meet design requirements, which will increase construction costs and time. In order to reduce the phenomenon of under excavation, a series of measures need to be taken during the construction process, such as improving drilling accuracy, optimizing blasting design, strengthening construction management and measurement work, etc.
For example, strengthening the training of drillers to enable them to master drilling techniques proficiently; Reasonably determine the depth of the borehole based on geological conditions and construction requirements; Carefully carry out drilling and blasting design, select appropriate explosive varieties and loading methods; Using high-precision instruments for measurement, accurately drawing excavation contour lines, etc. At the same time, it is necessary to strengthen inspections during the construction process, promptly identify and address any issues of under excavation.
In tunnel engineering, it is very important to control over excavation (actual excavation section exceeding the design size) and under excavation, which helps to ensure project quality, reduce costs, improve construction efficiency, and ensure the stability of surrounding rock.
Anchor rod trolley, a self-propelled equipment for anchor rod support operations in underground engineering such as mining shafts, tunnels, etc
Anchor rod trolley is a self moving equipment that drills anchor rod holes in the roof or side walls of underground tunnels and completes partial or complete the installation of anchor rods. With the popularization and development of anchor rod support operations in underground engineering such as mining tunnels and tunnels, anchor rod trolleys have become an indispensable and important equipment in these projects. Their high efficiency, intelligence, multifunctionality, and flexibility provide strong support for modern tunnel construction.
1、 Main characteristics of anchor rod trolley
Efficiency: The anchor rod trolley can automate the anchor rod support operation, greatly reducing the labor intensity of workers and improving construction efficiency.
Intelligence: Modern anchor rod trolleys often use computer-controlled trolley control systems, which can achieve precise positioning and automated operations, improving construction quality and consistency.
Multifunctionality: The anchor rod trolley not only has drilling function, but also can complete processes such as grouting and installing anchor rods, realizing the full process mechanization of anchor rod support operation.
Flexibility: The design of the anchor rod trolley is flexible and can adapt to the requirements of anchor rod support operations at different heights and angles.
2、 Advantages of anchor rod trolley
Improve construction efficiency: The anchor rod trolley can automate the anchor rod support operation, greatly shortening the construction period.
Improving construction quality: Through a computer-controlled trolley control system, precise positioning and automated operations can be achieved, improving construction quality and consistency.
Reduce labor intensity: The application of anchor rod trolleys reduces the labor intensity of workers and improves construction safety.
Enhanced adaptability: The design of the anchor rod trolley is flexible and can adapt to the needs of anchor rod support operations at different heights and angles, improving the versatility and adaptability of the equipment.
3、 Types of anchor rod trolleys
Anchor rod trolleys can be classified into various types based on their structure and function, such as tower type anchor rod trolleys, thruster type anchor rod trolleys, and rotary type anchor rod trolleys. These different types of anchor rod trolleys each have their own characteristics and application scenarios.
4、 Application scenarios of anchor rod trolley
Tower type anchor rod trolley: composed of drilling arm, hydraulic rock drill, walking mechanism, and control system, etc. The hydraulic rock drill is installed at the top of the drilling arm, and the drilling of anchor rod holes is achieved through the lifting and lowering of the drilling arm.
Propeller type anchor rod trolley: Similar to tower type anchor rod trolley, but its hydraulic rock drill is propelled by a thruster, which can swing back, forth, left, and right at a certain angle to meet the needs of different hole positions.
Rotating anchor rod trolley: using a rotating frame instead of a propeller, the rotating frame can drill anchor rod holes and install anchor rods, with higher operational efficiency.
Anchor rod trolleys are widely used in various underground engineering constructions such as tunnel excavation and underground factory building excavation. It can efficiently perform tasks such as blasting drilling, anchor drilling, automatic clamping and pushing of anchor rods, and automatic grouting, becoming an indispensable equipment in underground engineering.
How to maintain a rock drill for a longer service life? Storage and maintenance guidelines for extending the service life of rock drills
Rock drills are important equipment in engineering construction, and proper storage and maintenance can greatly extend their service life, ensuring that the equipment can operate efficiently when needed. The following is a detailed guide for the storage and maintenance of rock drills:
1. Selection of storage environment
1.1 Dry Warehouse: Ideally, a dry and non humid warehouse should be selected for storage to prevent equipment from getting damp and rusting. If a suitable warehouse cannot be found and needs to be stored outdoors, a flat wooden board should be laid on the ground, the rock drill should be placed on the board, and covered with high-quality cloth to prevent rainwater and dust from entering.
1.2 Equipment arrangement: When multiple rock drills are stored in the warehouse, appropriate distance should be maintained between the equipment. This not only helps with ventilation, but also prevents contact between metals, reducing possible chemical reactions and mechanical damage.
2. Preparation before storage
2.1 Inspection of Components: Before storage, it is necessary to thoroughly inspect all components of the rock drill to ensure that they are intact and undamaged. If any damage or missing components are found, they should be repaired and replaced in a timely manner to ensure that the machine is in the best condition for the next use.
2.2 Battery disassembly and storage: Generally, the battery of a rock drill should be disassembled and stored separately. The battery should be placed in a suitable temperature environment to avoid high temperatures and prevent explosions; Low temperature environments should also be avoided to prevent battery freezing and cracking. Appropriate temperature can extend the lifespan of batteries and ensure their performance.
3. Key points of daily maintenance
3.1 Regular Inspection: Even long-term stored equipment needs to be regularly inspected to ensure that there are no issues such as rust or loose components. Regular inspections and simple maintenance can prevent small problems from turning into major malfunctions.
3.2 Lubrication and Maintenance: Regularly lubricate and maintain the equipment, especially for transmission and moving parts, to ensure smooth operation. Long term storage of equipment may cause the lubricating oil to deteriorate, therefore it needs to be replaced regularly.
3.3 Dust prevention measures: During storage, equipment is prone to dust accumulation, especially when stored outdoors. Equipment should be cleaned regularly to maintain surface cleanliness and prevent dust from entering the interior and affecting machine performance.
Reasonable storage and maintenance are key to extending the service life of rock drills. Choosing a suitable storage environment, preparing for storage, conducting regular inspections and maintenance can ensure that the rock drill is always in the best working condition when needed, reduce failure rates, and improve work efficiency. Through these measures, the service life of rock drills can be greatly extended, maintenance and replacement costs can be saved, and overall engineering efficiency can be improved.
What are the advantages and disadvantages of different types of tunnel support methods?
What are the advantages and disadvantages of different types of tunnel support methods? Common tunnel support methods include anchor spray support, anchor rods, shotcrete, steel arches, etc., each of which has its own advantages and disadvantages. The following is a specific introduction:
1. Anchor spray support
Advantages: Good flexibility and adaptability to different surrounding rock conditions; Strong timeliness, able to be quickly implemented after excavation; Has close adhesion and can be tightly combined with surrounding rock; Excellent depth, able to penetrate deep into the surrounding rock and play a role; Has a certain degree of flexibility, allowing for appropriate deformation of the surrounding rock; It has good sealing properties and can effectively prevent the weathering and loosening of surrounding rocks.
Disadvantages: Its support effect is greatly affected by construction quality; For particularly weak or unstable surrounding rocks, it may be necessary to combine other support methods.
2. Anchor rod support
Advantages: It can effectively support the surrounding rock and improve its stability; It can strongly reinforce the surrounding rock, increase its strength and bearing capacity; Can increase interlayer frictional resistance and enhance the connection between rock layers; Plays a suspension role to prevent local rock mass from loosening and falling off.
Disadvantages: The anchoring effect of anchor rods is affected by rock conditions, and the anchoring force may be insufficient in some fractured or weak rock masses; Construction requires certain technical and equipment support; In long-term use, the durability of anchor rods may be affected by factors such as corrosion.
3. Spray concrete support
Advantages: It can provide timely support for the surrounding rock and limit its deformation; Has unloading function and can share part of the load borne by the surrounding rock; Can reinforce the surrounding rock and improve its overall integrity; Can cover the surface of the surrounding rock and prevent it from loosening and peeling off; The construction is relatively simple and fast.
Disadvantages: The quality of sprayed concrete is greatly affected by construction techniques and material mix proportions; High rebound rate may result in certain material waste; The technical requirements for construction personnel are high to ensure the uniformity and compactness of spraying.
4. Steel arch support
Advantages: The overall stiffness is relatively high, which has a good supporting effect on fractured rock or rock with low rock grades; Can be made and assembled on site, suitable for tunnels with different cross-sections and conditions; It can be well combined with other support methods such as anchor rods and shotcrete to work together and improve support efficiency.
Disadvantages: Large amount of steel used, relatively high cost; Installation requires a certain amount of time and manpower; The weight of steel arches is relatively large, and the transportation and installation process is relatively complex.
In practical engineering, one or more support methods are usually selected comprehensively based on the specific geological conditions, surrounding rock types, tunnel uses, construction methods, and other factors of the tunnel to achieve safe, economical, and reasonable support effects. At the same time, monitoring and measurement during the construction process are also very important. Based on the monitoring results, support parameters can be adjusted in a timely manner to ensure the stability and safety of the tunnel.
What are the special techniques or materials for tunnel construction in soft rock areas?
When tunnel construction is carried out in soft rock areas, special techniques and materials are required to ensure construction safety and long-term stability of the tunnel due to the low strength, high compressibility, and easy deformation of the rock. Here are some commonly used techniques and materials:
Technologies required for tunnel construction in soft rock areas:
1. Shotcrete support: The use of Shotcrete technology can quickly provide temporary support structures to prevent rock loosening and collapse. Shocked concrete can be directly sprayed onto the tunnel wall to form a continuous and uniform support layer.
2. Steel arch support: In soft rock, steel arch support is a common way of support, which can provide immediate structural support and be combined with sprayed concrete to increase overall stability.
3. Anchor rods and cables: By installing anchor rods or cables in the surrounding rock, the rock can be fixed together, improving the overall bearing capacity of the surrounding rock. These anchor rods or cables are typically used in conjunction with shotcrete and steel arches.
4. Freezing method: In extreme soft rock environments, such as clay and sand with extremely high moisture content, the freezing method can be used to temporarily freeze the formation, forming a sturdy shell for tunnel construction.
5. Grouting reinforcement: By injecting cement slurry or other types of chemical slurry into the surrounding rock, cracks and pores can be filled, improving the strength and stability of the rock.
6. Step by step excavation method: Using step by step excavation techniques such as the New Austrian Tunneling Method (NATM), the excavation and support steps can be flexibly adjusted according to the conditions of the surrounding rock to maintain the stability of the tunnel.
Materials required for tunnel construction in soft rock areas:
1. High performance shotcrete: Using shotcrete with high early strength and high fluidity can provide sufficient support strength in a short period of time.
2. High strength steel: Steel used for manufacturing steel arches and anchor rods needs to have high strength and good toughness to withstand stress and deformation in soft rock.
3. Rapid setting cement slurry: The cement slurry used for grouting reinforcement needs to have the characteristic of rapid setting in order to quickly improve the strength of the surrounding rock.
4. Chemical grouting materials: In addition to traditional cement slurry, various chemical grouting materials such as epoxy resin, polyurethane, etc. can also be used, which can better penetrate small cracks and provide effective reinforcement effects.
5. Anti leakage materials: Waterproofing and anti-seepage are important considerations in the construction of soft rock tunnels. Various anti-seepage membranes, coatings, and sealants can be used to prevent groundwater infiltration.
When carrying out tunnel construction in soft rock areas, engineers need to choose the most suitable combination of technology and materials based on specific geological conditions, construction equipment, and budget factors. At the same time, it is necessary to closely monitor the deformation and stress changes of the surrounding rock, adjust the construction plan in a timely manner, and ensure construction safety and long-term stability of the tunnel.
A new chapter in school-enterprise cooperation! Lanhi’s second “field engineer” internship officially started!
Midsummer is here, and the passion is like fire. On July 15, Lanhi Chengdu headquarters welcomed 11 intern engineers from Deyang Jiaotong University. Their arrival marked the official launch of Lanhi's second school-enterprise cooperative "field engineer" project. The project aims to deepen school-enterprise collaborative innovation, promote the precise training of Lanhi's new era outstanding engineers, and lay a solid foundation for the company to actively develop new quality productivity.
1. Set sail and a new chapter has begun
Lanhi Vice President of Technology Qiu Zhangling attended the induction ceremony and delivered a speech. He emphasized that the development of Lanhi's "field engineer" internship and training is based on the school-enterprise cooperation mechanism of "dual-track parallel development and real-life talent training", focusing on future development, and cultivating "on-site" in front-line positions such as production, projects, management, and services. It is a composite high-quality engineering application talent with craftsman spirit, precise operation, knowledge of technology, good management, high collaboration, and strong innovation. It is hoped that all interns will closely follow the industry needs, focus on skill development, complete internship tasks with vigorous work enthusiasm and positive learning attitude during the next 6 months of systematic training and on-the-job internship, and open a new chapter in their career.
2. Two-track progress and real-life talent cultivation
2.1 Real-life training and unity of knowledge and practice
This internship focuses on improving the on-site response capabilities of engineers. Through the carefully designed "theoretical learning + on-site practice + on-the-job internship" links, it comprehensively strengthens the control of mechanical equipment manufacturing processes, covering key links such as drawing analysis, material processing, precision assembly, welding technology, electrical design, system integration, equipment debugging, and quality control. In this way, interns can deeply apply their professional skills, closely combine theory with practice, stimulate internal learning motivation and professional innovation ability, and achieve a win-win situation for the common growth of individuals and enterprises.
2.2 Safety in production, the soul of internship
In order to deeply embed the concept of safety in production into the internship, the internship instructor will promote the core concept of "equal emphasis on supervision and safety in production" to each intern, explain safety knowledge, analyze potential dangers on site, analyze accident cases, clarify the operating procedures and precautions of each type of work, and explain the company's safety management system in depth. Adhering to the working ideas of safety first, integration, overcoming difficulties, and pioneering innovation, advocating the spirit of collaboration, and building a solid safety barrier for the efficient and long-term development of corporate productivity.
2.3 Examination and learning go hand in hand to create excellence
In order to accurately evaluate the skills of interns, the training instructor will hold regular review exams to stimulate the spirit of learning and catching up among trainees, and list the assessment results as an important indicator of regularization qualifications. Use exams to promote learning and apply what you have learned to ensure that everyone is proficient in what they have learned, truly understands, truly uses, and is truly professional, and uses solid skills to help Lanhi's high-quality equipment casting and promote the company to move towards higher standards.
2.4 Strong wind and full sails, high morale
In the future, Lanhi will continue to rely on innovative scientific research platforms and production training bases as a fulcrum, take on-site engineer training as a starting point, continuously innovate school-enterprise cooperation models, build an all-round (Chengdu·Changsha) open and shared integrated internship practice industry-education integration system, continue to cultivate high-level engineering and technical talents, and inject continuous vitality into the high-quality development of enterprises and the innovation and progress of the industry.
LanHi conducts induction training for 2024 graduates!
The roc spreads its wings and soars into the sky. It is the right time for youth to forge ahead, and young people should be ambitious!
Recently, Lanhi welcomed the "new force" of 2024. 24 fresh graduates from Xihua University, Southwest Jiaotong University and Lanzhou University of Technology successfully joined Lanhi, including 5 postgraduates. The company's general manager Lan Bing, deputy general manager Tang Fei, deputy marketing general manager Wei Min, deputy general manager He Xiaojiang, deputy general manager Feng Huai, deputy technical general manager Qiu Zhangling and others attended the new employee induction training ceremony.
General Manager Lan Bing warmly welcomed the arrival of all new employees and emphasized Lanhi's talent concept-"grand blueprint, embracing all rivers". General Manager Lan pointed out that the company is like the sea, recruiting talents from all directions and drawing a development blueprint with like-minded people. I hope that every employee can realize their self-worth in Lanhi and grow together with the company.
Therefore, he also put forward ardent expectations and requirements for new employees: First, responsibility comes before intelligence, and they should adhere to the working attitude of "seeking truth and being pragmatic, and striving for excellence"; second, details should achieve excellence, and they should have the enterprising spirit of "working hard and accumulating strength"; third, they should always learn and innovate, and maintain the enterprising attitude of "being good at thinking and courageous in practice"; fourth, they should maintain excellent quality and show the spirit of "confidence, self-reliance, and hard work". I hope everyone will carry forward the youthful vitality and creativity and inject youthful power into the development of infrastructure.
Grand blueprint, embracing all rivers
General Manager Lan emphasized that the company's management needs to attach great importance to the training of new employees: first, strengthen the care and concern for new employees, understand the needs of new employees through multiple channels, respond to help solve problems in a timely manner, support diversified development, and open a co-creation and sharing mechanism to effectively boost the cohesion and centripetal force of new employees; second, think about how to make new employees shine. New employees shoulder the important mission of promoting the company's digital transformation and innovative and excellent development. We must attach importance to the inheritance and promotion of corporate culture, so that new employees can quickly take root in the team; third, talent training requires long-term investment and attention. The company needs to continuously optimize talent standards, continue to discover and cultivate outstanding new employee models, play a demonstration and leading role, and accelerate the growth of new employees.
In the subsequent 5-day new employee induction training activities, the company arranged a wealth of learning modules and centralized training sessions to help new employees deeply understand the corporate culture, and establish trust and collaboration with colleagues, so that each new employee can quickly integrate into the team and smoothly adapt to the working environment.
Breaking the ice and integrating, gathering centripetal force
In order to eliminate the sense of distance of new employees as soon as possible, the Administration Department specially organized a "Newcomer Sharing Meeting" for the company's management staff to share and communicate with new employees, so that everyone can quickly get familiar with each other, enhance the sense of closeness and cohesion, dispel the sense of strangeness between each other, and enhance the centripetal force of the group.
Quality training, career start
The heads of relevant fields of various departments gave their best to teach and train on many contents such as the company's development history, corporate culture, rules and regulations, safety knowledge, quality management, professional knowledge, and career planning. Help new employees to fully understand the company, quickly complete the role transition and career positioning from students to professionals, and improve their work cognition and understanding.
Explore and visit, deepen understanding
In order to promote new employees to integrate into work as soon as possible, the Human Resources Department arranged for new employees to visit the factory and manufacturing workshop. All new employees visited the production workshop, R&D base and equipment commissioning center, and watched the operation display of Lanhi intelligent equipment at close range, deeply felt the intelligent advantages of Lanhi as an innovative equipment company, and also inspired their infinite longing for their own career development and technological innovation.
Soul-building and inspirational, teamwork
In order to forge the team spirit and collaboration ability of new employees, the company carefully planned outdoor development and military training activities. Everyone was heroic and heroic. Under the leadership of professional coaches, they stood in military posture, marched in step, trained in queues, and played games... Each training tested everyone's execution and cooperation. In practice, everyone learned to trust and rely on teammates, deeply understood the power of teamwork, and laid a solid team foundation for future work.
Welcome to the "basket" and create good results
On the last day of the training, the Lanhi2024 welcome basketball game kicked off with warm applause and cheers. On the court, the new employees used basketball as a medium to show their enthusiasm and vitality. Every dribbling, breakthrough, and layup was full of strength and wisdom. Every effort, struggle, and cooperation were fighting for the honor of their team. I hope that in subsequent jobs, they can also welcome the "basket" and create good results as on the court!
Youth sets sail, dreams set sail; Lanhi's new chapter, let's paint a brilliant picture together!
With the successful conclusion of the new employee induction training activities, the new forces of Lanhi Intelligent Equipment are ready to go. They will be full of passion and actively devote themselves to the subsequent internship work, interpret responsibility and commitment with practical actions, and use their youth and wisdom to contribute to the company's future. Lanhi will also continue to pay attention to the growth of every new employee and provide them with a broad stage and sufficient resources. We believe that in the Lanhi family, every new employee can constantly surpass themselves, realize personal value, grow together with the company, and paint a brilliant picture together!